SAP APO PPDS

Contract| Remote in Latin America
| 5 months ago
  • Materials, BOMs, and resources
  • Production versions
  • Work centers (linked as resources)
  • PDS (Production Data Structure) or PPM (Production Process Model)
  • Transfer demand from SAP ERP or SAP S/4HANA
  • Use Planned Independent Requirements (PIRs) or sales orders
  • Align demand with planning strategies
  • Create planned orders to cover shortages
  • Examples:
    • SAP_PP_001 (Standard heuristic)
    • SAP_PP_002 (Multi-level planning)
  • Assign operations to specific resources and times
  • Consider:
    • Capacity constraints
    • Setup times
    • Sequence dependencies
  • Use PP/DS optimizer to improve plans based on objectives:
    • Minimize delays
    • Reduce setup times
    • Balance resource utilization
  • Use graphical tools:
    • Product View
    • Resource View
    • Detailed Scheduling Planning Board
  • Drag & drop orders
  • Resolve conflicts manually
  • Simulate scenarios
  • Identify issues automatically:
    • Capacity overloads
    • Late orders
    • Missing components
  • Convert planned orders → production orders
  • Send to execution in ERP (e.g., shop floor)
  • Works with:
    • PP (Production Planning)
    • MM (Materials Management)
    • SD (Sales & Distribution)

A PP/DS planner might:

  1. Check alerts
  2. Run heuristics
  3. Review product/resource views
  4. Adjust schedule manually
  5. Run optimizer (if needed)
  6. Release orders
  • Finite vs infinite scheduling
  • Pegging (link between supply & demand)
  • Setup matrix
  • Planning horizon